Skip to content
Sheathed two-story wood-framed cottage buildings lining a new street at Park Place in Oregon City

Owner-led · Puget Sound to Portland

Framing & panelized systems

Wood • Cold-formed steel • Mass timber

Grit Framing is a new, minority-owned framing contractor founded by Mario Hernandez — built on 20+ years of construction leadership in multifamily, podium, mixed-use, and commercial construction.

20+ years

Of construction leadership behind a new company.

Mario Hernandez

Founder and owner. A minority-owned company.

Owner-led

Direct owner involvement on every project.

Puget Sound to Portland

The I-5 corridor from Seattle and Tacoma through Clark County to the Portland metro.

Core services

Wood, steel, and mass timber.

Site-built or panelized, with clear scope, practical planning, and direct owner involvement. We understand the coordination and communication general contractors need from a framing partner.

Framing crew raising a wood wall panel on a slab at Park Place

01

Wood Framing

Wall, floor, and roof framing — site-built or panelized — including sheathing, blocking, backing, and related framing components.

  • Walls
  • Floors
  • Roofs
  • Sheathing
Interior partition walls framed with galvanized light-gauge steel studs and track

02

Cold-Formed Steel Framing

Steel stud walls and partitions coordinated with project plans, layout requirements, and adjacent trade scopes.

  • Steel studs
  • Layout
  • Trade coordination
Open mass timber floor with glulam columns and beams, a CLT deck and ceiling, a wrapped panel stack on blocking, and a continuous perimeter guardrail

03

Mass Timber

CLT, glulam, and hybrid mass timber packages — panels, beams, and connections set to the structural drawings and coordinated with light-frame and podium work.

  • CLT
  • Glulam
  • Hybrid
Laptop showing a 3D clash-detection model where a plumbing drain line runs through a wood beam, highlighted in red, beside rolled framing plans

04

Planning & takeoffs

Plan-measured quantities, clear scope, and practical planning before framing starts — so the bid reflects the drawings.

  • Quantity takeoff
  • Scope review
  • Scheduling

Full scope breakdown

Safety first

Safety before budget or schedule.

No production target or deadline is worth an injury. If a task can't be done safely, it stops until it can — and we plan the work so that rarely has to happen.

  • Safety planned into the sequence before work starts
  • Every worker has the authority to stop unsafe work
  • Safety leadership from the owner down
  • Quality is never traded for budget

A clean site is a safe site.

A cutoff on the deck, a loose nail, a cord across a walkway — that's how trips, falls, and puncture injuries happen. So we clean as we go, every day. A clean deck also means accurate layout, less damaged material, and a better handoff to the next trade.

  • Decks swept and scrap removed every day
  • Nails, cutoffs, and banding picked up as we go
  • Material stacked and staged out of walkways
  • Stairs, ladders, and exits kept clear
Wall panels standing on the slab with diagonal braces, lumber stacked on dunnage and covered, at Park Place

Experience behind Grit Framing

New company. Experienced leadership.

Mario's prior roles include superintendent, project manager, estimator, and construction business owner. His background combines field supervision, scheduling, cost control, safety leadership, and trade coordination.

  • Field supervision
  • Scheduling
  • Cost control
  • Safety leadership
  • Trade coordination
  • Estimating

2,020

Residential units

Construction experience across Mario Hernandez's career.

Résumé-based total includes named portfolio projects and additional completed projects. Reflects Mario Hernandez's prior-role experience, not projects completed by Grit Framing or Grit Framing contract scopes.

Current work

Park Place

Rough framing for Truebeck Construction at the Oregon City Cottage Cluster — 200 homes across 52 buildings for the Housing Authority of Clackamas County.

Roof framing and sheathed walls going up across a row of cottage buildings

Walls & roof framing

Sheathed walls and roof framing moving down the row, building by building.

  • Walls
  • Roofs
Interior view of ceiling joists on metal hangers above sheathed stud walls

Framing hardware

Joists, hangers, and straps set to the structural drawings.

  • Floors
  • Hardware
Framed buildings with weather barrier and a two-story sheathed section at Park Place

Site progress

Buildings moving from framing toward dry-in across the site.

  • Multifamily
  • Wood framing

See the project

How a job runs

Four phases, no surprises

Clear scope and practical planning up front, so general contractors always know what we're doing and what we need next.

01

Takeoff & bid

Quantities measured off your plans, hardware counted from the schedules, and a bid that shows the scope and assumptions behind it.

02

Planning & mobilization

Scope, layout requirements, schedule, and adjacent trades coordinated before we set foot on site.

03

Framing

Wood, steel stud, or mass timber — walls, floors, roofs, panels, sheathing, blocking, and backing — sequenced to keep the trades behind us moving.

04

Inspection & closeout

Work checked ahead of inspection, punch items closed, and the area left ready for the next scope.

Invite Grit Framing to bid your next project.

Send your plans and framing scope. Let's discuss the requirements, schedule, and fit. — Mario Hernandez, Owner